A D I V I S I O N O F P E L I C A N I N T ’ L
INSTALLATION INSTRUCTIONS
Inspection: Prior to installation, inspect planks in daylight for visible faults/damage. Check if
subfloor/site conditions comply with the specifications described in these instructions. If you are
not satisfied, do not install and contact your supplier.
Before Laying: Measure the room at right angle to the direction of the planks. For best visual effect,
planks in the final row should be at least 2 inches wide (half width of plank minimum). For this
purpose, planks in the first row can be cut to smaller size. Shuffle planks in order to obtain a
pleasant blend of shades. Lay planks preferably following the direction of the main source of light.
Expansion Gaps: Provide 3/8" (10 mm) expansion gaps to the walls and other fixed objects. Areas
greater than 900 sqft (100 m^2) or 30 feet (10 m) in either direction, transitions between rooms,
and asymmetrical areas require extra expansion gaps utilizing a T-Mold.
Metropolitan Collection XL
Installation Instructions
INSTALLING THE FIRST ROW:
Starting from the LEFT with the tongue facing the wall, carefully place the
first board in place. Use spacers along the wall allowing required expansion
gap (3/8” or 10 mm). (Figure 1)
1.
Align the next piece by overIapping the end of the first board so that the
joint is tight when the board lays flat. Some slight adjustment of the board
may be necessary to assure a tight fit. Place spacers against wall to restrain
movement and maintain expansion gap.
2.
Continue in this manner until reaching the final plank in the first row.
3.
Cut the final board piece to Iength, allowing for the required expansion gap.
4.
Place spacers against wall to restrain movement and maintain expansion
gap.
5.